CHANGELOG

What we shipped.

Product updates and improvements to CastOS, newest first.

Mar 1, 2026

Engineering Module V1

new

AI-powered drawing takeoff, structure and mark management, revision tracking with diff comparison, submittal workflows, and the engineering review panel. Upload a drawing package and get production-ready piece data.

Feb 20, 2026

Document Hub

new

Centralized document management with folder trees, PDF and image viewer, version history, and auto-filing by entity type. Every document tied to the job, piece, or inspection it belongs to.

Feb 10, 2026

Production Board V2

improved

Rebuilt Gantt scheduling with constraint validation. Bed assignments respect cure times, crew availability, and form set dependencies. Drag to adjust and everything recalculates.

Jan 28, 2026

Quality Control V2

improved

Configurable inspection checklists by product type, break test tracking with automatic spec validation, NCR workflow with disposition and root cause analysis. PCI audit-ready from day one.

Jan 15, 2026

Platform Launch

new

CastOS enters early access. Eight integrated modules covering estimating, job tracking, production, dispatch, QC, inventory, engineering, and financials. AI onboarding imports your plant data in hours, not months.